New Design Upgraded 2/4/6 Seater Golf Carts Cool 48V/72V Electric Golf Carts for Family and Hunting
US$3,200.00 | 1 Piece (MOQ) |
Port:
Shanghai, China
Production Capacity:
6000 Sets/Year
Payment Terms:
T/T
Dezhou Anbu Automobile Industry Co., Ltd.
Jiangsu, China
Last Login Date:
Jul 21, 2025
Business Type:
Manufacturer/Factory
Main Products:
Golf Cart, Sightseeing Bus, Mobility Scooter, Electric Tricycle, Electric Vehicle, Electric Scooter, Electric Motorcycle, Golf Car, Electric Car
Find Similar Products
Product Description
Company Info
Basic Info.
Model NO.
M8
Type
Buggy/Golf Carts
Seats
1-8
Power
≤300W
Power Fuel
Maximum Speed
20-30 km/h
Gradeability
<20%
Suitable for
Golf Course
Voltage of Battery
60V
Color
Blue
HS Code
8703101900
Product Description
Vehiclemode | M8 | Wheel track | 900mm |
Size(L*W*H) | 2600*1350*1980(mm) | Battery | 100A Maintenance Free Colloidal Battery / Large Ca |
Passenger | 2people | Motor | 4.0kw AC asynchronous motor |
Max Speed | 30Km/h | Controller | 60VLow voltage AC controller |
Braking distance | ≤4m | Drive system | RWD(RearWheelDrive) |
Driving Mileage | 80-100Km | Front Suspension | Plate spring front suspension |
Gradeability | 25% | Rear Suspension | Ntegral bridge rear suspension |
Curb weight | 550Kg | Braking system | Rear wheel mechanical braking/Parking braking |
Tyre | Wide tires for golf carts | Steering system | Rack and pinion type steering machine |
Seat | Foamed sponge+high rebound PU leather fabric | Light&Signal | Combined headlights, turnsignals, combined rear lights,electric horn |
Instrument board | Electric meter,forward and back switch | Body material | Steel frame+ABS engineering plastic molding parts |
Body color | White/ yellow /gold /green /support custom colors |
FAQ
-------------------------------
Q1.Can I get some samples?
A: We are honored to offer you samples for quality check.
Q2. What is your MOQ?
A: We do not have MOQ request. You can order just 1 sample car. However, additional packing and operating cost will be charged if delivered in LCL way.
Q3. How about your delivery time?
A: Generally, it will take 20 to 30 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q4: Can I mix different models in one container?
A: Yes, different models can be mixed in one container, but the quantity of each model should not be less than MOQ.
Q5. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q6: How do you control the quality?
A: We take pre-production, in-line and final inspections to ensure all the machines can meet the quality standard for world wide customers.
Q7. How you pack the vehicles?
A: Generally, we pack out goods in containers by iron frame. If you have special requirement we can foll
Send your message to this supplier
People who liked this also liked